Early project preparation
Project/site preparation and long-lead planning before major offshore activity.
- Timing
- Months to years before installation
- Subscriber value
- Forward indicator for future vessel demand.
Sprint 12 · Project / Vessel / Activity Architecture
Intelatus should model tow-out, mooring pre-lay, heading control, hook-up, commissioning and long-term operations as distinct activity events. This supports market analysis while protecting granular vessel identity data behind entitlement controls.
Core relationship model
A single activity can involve several vessels. A single vessel can participate in multiple activities over time. Role instances such as Ocean Towing 1, Ocean Towing 2, Mooring Pre-Lay AHTS 1 or Hook-Up Subsea Vessel 1 preserve analytical value even when individual vessel names are masked from subscribers.
Lifecycle stages
Project/site preparation and long-lead planning before major offshore activity.
AHTS, subsea and MSV spreads mobilize from port to site to install anchors, chains, lines and related components before asset arrival.
One or more towing vessels move a floating production unit, floater or turbine assembly from origin to site.
AHTS/tug vessels hold or control position during mooring connection, riser/umbilical installation or hook-up.
AHTS, subsea vessels, SOVs and support craft connect and tension moorings, array cables, risers and utilities.
Once installed, assets receive regular support from standby, firefighting, supply, terminal tugs, offtake and utility vessels.
Intervention, inspection, repair, subsea, utility and walk-to-work activity after commissioning.
Activity archetypes
| Activity | Vessel roles | Speed / behavior pattern | Analysis use | Subscriber view | Internal view |
|---|---|---|---|---|---|
| Ocean towing OCEAN_TOWING · FPSO / floating wind / floating assets |
Ocean towing AHT/tug 1, 2, 3... | Moving at low tow speed; often 2-3 knots for wet tow Days to weeks |
Major project milestone, high bollard-pull vessel demand and route intelligence. | Aggregated tow activity by basin, project stage and period | Full vessel identities, IMO/MMSI, route, validation confidence and assignment numbers |
| Heading control HEADING_CONTROL · FPSO / FLNG / floating wind |
Heading control vessel 1, 2, 3... | Static or near-static, generally around 0 knots Hours to days per operation |
Identifies hook-up/station-keeping activity rather than ordinary transits. | Activity count, duration and region | Full vessel IDs, tracks, project association and analyst override |
| Mooring pre-lay AHTS MOORING_PRELAY_AHTS · Floating wind / FPSO |
Mooring pre-lay AHTS 1, 2, 3... | Transit to site around service speed; installation work can show low-speed patterns Often 2-4 months |
Forward signal for project execution and upcoming floater/FPS arrival. | Pre-lay campaigns by region/project type | Full spread composition, vessel IDs, ports, timing and internal validation notes |
| Mooring pre-lay subsea/MSV MOORING_PRELAY_SUBSEA · Floating wind / FPSO |
Mooring pre-lay subsea vessel 1, 2... | Transit to site and low-speed work near installation area Often 2-4 months |
Measures demand for MSVs/subsea vessels and installation capacity. | Subsea/MSV demand by period and basin | Full vessel identities, equipment fit and validation confidence |
| Hook-up AHTS HOOKUP_AHTS · FPSO / FLNG / floating wind |
Hook-up AHTS 1, 2, 3... | Low-speed or static near asset during connection/tensioning Weeks to months |
Key specialized vessel demand during final installation. | Hook-up activity signals and charted trends | Full assignments, vessel identities, tracks, project link and analyst notes |
| Hook-up subsea/MSV HOOKUP_SUBSEA · FPSO / FLNG / floating wind |
Hook-up subsea vessel 1, 2... | Low-speed work near site; may include port/site cycling Weeks to months |
Connects subsea activity to project stage and vessel demand. | Aggregated hook-up subsea activity | Full detail for analysts and consulting output |
| Hook-up SOV / W2W HOOKUP_SOV · Floating wind / FPSO support |
Hook-up SOV or W2W vessel | Stationary or repeated site visits Weeks to months |
Identifies W2W/SOV demand in installation and commissioning. | SOV demand signals by market | Full vessel identity and project assignment |
| Long-term operations support OPERATIONS_SUPPORT · FPSO / FLNG / FSRU / wind farm |
Safety standby, firefighting, resupply, terminal tug, utility, offtake support | Regular calls or station/standby patterns Years; often long-term charter |
Ongoing fleet demand, charter opportunity and regional support profile. | Aggregated support activity and recurring call patterns | Full granular vessel-call and company relationship access |
Design rules
Data entities
The commercial project or field being developed or supported.
FPSO, FLNG, FSRU, rig, platform, floating wind unit or other asset linked to activities.
A time-bound market event such as tow, pre-lay, hook-up, commissioning, support or intervention.
A vessel’s role inside an activity, including numbered role instance and dates.
Port, site, field, country, basin, from/to, work area and movement corridor.
How Intelatus knows the relationship/activity is likely correct.